Background
Inordinately heavy monsoon rains during August 2017 have resulted in flooding and landslides in 28 districts of Nepal; of these districts, 19 are considered severely affected. The latest situation reports from the Nepal Red Cross Society (NRCS) indicate more than 1.7 million people (352,738 households) have been affected, with 461,000 persons (92,210 families) displaced and 141 deaths (Nepal Red Cross Society, Flood situation report, Aug 23 2017). American Red Cross is providing support to Nepal Red Cross Society through the IFRC appeal and bilaterally in response to the flood.
In partnership with American Red Cross, Nepal Red Cross Society will implement the Nepal 2017 Floods Early Recovery Project in Sarlahi district through a bilateral agreement.
The project has two components: promote flood resilient habitats and establish raised community tube wells serving marginalized families.
In order to support and guide implementation of the project at district level, the American Red Cross (AmCross) is seeking an experienced Project Engineer to work closely with the NRCS to provide technical support at district level. The initial contract duration for the Project Engineer is for Six Months with possibility of extension.
The Project Engineer will be based in Sarlahi, Nepal. The position will report to the Early Recovery Project focal person of American Red Cross Nepal Delegation and the Response Lead. He/She shall maintain an integrated, collaborative relationship with M&E, Admin and Finance teams.
|
No comments:
Post a Comment
Comment